01
Soundproof Sweatproof Non Slip Custom Eco Fitness Workout Yoga Mat Skipping Oval Round PVC Tpe Jump Rope Mat
Non-slip design: The jump rope mat usually has a non-slip surface design to ensure that it will not slide during use, increasing the safety of the user.
Shock absorption function: The rope pad can provide a certain degree of shock absorption function to reduce the impact and pressure on the joints when jumping.
Sound reduction: The soft material of the jump rope pad can also reduce the noise generated during the jump rope and avoid causing interference to people around.
Strong durability: Skipping MATS are often subjected to the friction and wear of jumping and trampling, so they are usually made of materials with better wear resistance and can withstand long and frequent use.
Parameters
Material | PVC or TPE |
Personalized customization | Surface can print customer logo |
Backside with circular embossed | |
Color/Size | Customer can choice customize size and color |
Popular Shape | roude, oval, squal |
Thickness | 4/5/6/7/8 /10mm |
Package | Custom Packing Wrap paper+Normal carton |
Certification | ROHS, CA65, REACH, 16P. ECO-FRIENDLY |
Delivery Date | 25-30 days after order confirmation |
Payment term | L/C T/T D/P CAD |
Place of original | Guangdong China |
Port | Shenzhen/Guangzhou/Gaoming |
-
1
What is your payment term?
Most of customer choose T/T, 30% deposit, and 70% against BL draft copy within 7 days . we also accept L/C at sight, D/P at sight, and CAD.
-
2
What is your terms of delivery ?
FOB, EXW, CIF, CFR DDU.
-
3
How about your delivery time?
Normally around 15-40 days after order confirm and received deposit, it depends on the item and quantity your order.
-
4
Can you produce according to the sample
Yes, we can produce by sample color or design.
-
5
Can you offer product sample?
Yes we can provide A4 size sample for your check.
-
6
How long we can get the sample?
If exist sample that we have, may need 1-2 days around, depends on courier.
If according to customer’s new design, then need open a new mould need around 7-15 days around.